rss icon Subscribe
desktop mobile

Alfa Laval Maintains BWTS Production Despite COVID-19

(Image: Alfa Laval)

Having quickly adapted to the ongoing COVID-19 pandemic and lockdown measures from the Danish government, Alfa Laval said its Aalborg, Denmark factory continues to meet global production demands for its PureBallast 3 ballast water treatment systems - and has even surpassed expectations.

"While the world has slowed down, the implementation of the ballast water management convention remains unchanged," said Peter Sahlén, Head of Alfa Laval PureBallast. "We simply must continue meeting our customers' needs, regardless of the obstacles."

The Aalborg facility normally bustles with manufacturing teams, customers, class society representatives and visitors. Nevertheless, Alfa Laval is securing customer deliveries , even with far fewer people on the factory floor.

Alfa Laval said its approach has been a combination of rapid response and innovative thinking. The company took swift action to implement protective measures for employees, but also to secure components and materials that would be needed in the coming months. When the Danish government imposed a strict lockdown on March 11, the factory in Aalborg was well prepared.

"We moved quickly from two shifts to three shifts, working in smaller teams that can easily maintain a safe distance," said Søren Nord Larsen, who manages the factory in Aalborg. "There's no contact between shifts. So, if one of our workers should be infected, we can lift the entire shift out without impacting the others or any customer deliveries."

Even meals and breaks are taken individually, at different times. Tools are carefully handled and disinfected regularly, and support functions like purchasing and production planning are managed digitally to the greatest extent possible.

"It's tough to change so quickly and dramatically, but colleagues have really taken the situation with a positive attitude and adapted to the new routines," Larsen said. "Many come with their own ideas for improving things, because everyone wants this to happen for our customers."

Alfa Laval said it has managed to increase production during the same period. "We've proven that this can be done, and we're not simply maintaining the status quo," Larsen said. "In March we set a record of 400 systems produced for the quarter, and our deliveries for the quarter were yet another all-time high."

For Peter Sahlén, the high productivity in Aalborg builds on Alfa Laval's long-term planning. "We've made extensive preparations for ramp-up in the last two years, and that readiness has served us well in this unusual situation," he said. "We already had a systematic overview and allocated resources, which made it easier to recalibrate. Together with our customers we will make it through this situation - and our production will be even stronger on the other side."

May 6, 2020

 QRCode for link to Alfa Laval Maintains BWTS Production Despite COVID-19 story
 

Marine Equipment

WinGD’s Dual-fuel 12X92DF Engine Gains BV Type Apprval

WinGD’s dual-fuelled X92DF engine, the first in a series that will power nine ULCS for CMA CGM Group (Photo: WinGD)

The biggest and most powerful liquefied natural gas (LNG)-fueled engine ever built has received

Vestdavit to Equip US Navy Expeditionary Sea Base Newbuilds

The ESB 6 and ESB 7 are being built by NASSCO to the same design as the earlier ESB4, USS Hershal ‘Woody’ Williams, Woody, here pictured during sea trials (credit: NASSCO).

Boat launch and recovery systems supplier Vestdavit said it will deliver motion-compensated davits

Cox’s Diesel Outboard Enters Production

(Photo: Cox Powertrain)

UK-based engine manufacturer Cox Powertrain said its purpose-designed 300hp CXO300 diesel outboard

Ballast Water Treatment

Tech File: Automating Ballast Ops When Installing BWMS

Image: W&O/EMI

Installing ballast water treatment systems to comply with new regulations will require owners to

Evac BWMS Chosen for Irish Lights vessel

ILV Granuaile (Photo: Evac Group)

The Evac Evolution ballast water treatment system (BWMS) will be installed on the ILV Granuaile

Techcross Secures USCG BWMS Type Approval

© Larry / Adobe Stock

The U.S. Coast Guard Marine Safety Center issued a Ballast Water Management System (BWMS) Type